Coca-Cola Field is a 16,907-seat baseball park in Buffalo, New York that hosted its first regular season baseball game on April 14, 1988, as the tenants of the facility, the Buffalo Bisons, defeated the Denver Zephyrs, 1–0.HOK Sport designed the park as one of the first retro-classic ballparks. This concept featured classic and distinctive architecture, a grass, baseball-specific design, and a location within the downtown core. The same firm would bring this concept to the major leagues four years later with Oriole Park at Camden Yards.HistoryAt the time of the stadium's construction, Buffalo was hoping to get either an expansion Major League Baseball team or a relocated team; Buffalo was one of the five finalists in the early 1990s National League expansion process, which led to the 1993 debuts of the Colorado Rockies and Florida Marlins. The ballpark was built with a seating capacity of 19,500 people, which makes it the third largest stadium in minor league baseball. The design allows for future expansion to accommodate a major league team: capacity could be increased to nearly 40,000 by double-decking the existing mezzanine.In the first season the Bisons played at the stadium, the team shattered the previous minor-league attendance record, as many Buffalonians and visitors traveled downtown to enjoy the amenities offered by the new facility, which replaced the old War Memorial Stadium as the Bisons' home. In this first season, the Bisons outdrew a number of Major League teams.